Taylor Farms - Schilling Place
Monterey County, California · EIA plant ID 66459 · Operator: Bloom Energy
Nameplate1MWSummer 1 MW
Generators1in service
Net generation8GWh12 mo to Dec 2025
Capacity factor93%gas/coal/oil units, summer MW
Heat rate6,918Btu/kWhfossil units, electric fuel, HHV
First online2019Runs as baseload
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2022 | 7.1 | 81.0% | 7,311 |
| 2023 | 6.5 | 73.7% | 6,995 |
| 2024 | 8.5 | 96.7% | 6,720 |
| 2025 | 8.1 | 92.6% | 6,918 |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| TLR01 | Other Natural Gas | FC | 1 | 1 | Jul 2019 | Operating | — | coming soon |
Owner / operator
Operator: Bloom Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Bloom Energy | 100.0% | 1 MW |
Nearby plants
Within 80 km.
| TLR000 Hansen Fuel Cell | 3 MW | 0.3 km |
| D'Arrigo Brothers - Phase 4 | 2 MW | 4.4 km |
| Monterey Regional Water Cogen Facility | 2 MW | 14.4 km |
| Marina Landfill Gas | 5 MW | 14.5 km |
| Monterey Regional Water Pollution Contro | 1 MW | 16.4 km |
| Dynegy Moss Landing Power Plant Hybrid | 1,848 MW | 21.9 km |