Dynegy Moss Landing Power Plant Hybrid
Monterey County, California · EIA plant ID 260 · Operator: Dynegy -Moss Landing LLC
×300 MW battery retired since 2020 (latest Jan 2025)
Nameplate1,848MWSummer 1,470 MW
Generators8in service
Net generation2,569GWh12 mo to Aug 2026
Capacity factor12%gas/coal/oil units, summer MW
Heat rate7,108Btu/kWhfossil units, electric fuel, HHV
First online2002Runs as peaking
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2001 | 8,472.8 | — | — |
| 2002 | 6,540.8 | — | — |
| 2003 | 6,651.8 | 30.4% | 7,621 |
| 2004 | 6,440.1 | 29.3% | 7,197 |
| 2005 | 5,331.1 | 24.4% | 7,393 |
| 2006 | 6,308.4 | 28.8% | 7,891 |
| 2007 | 7,552 | 34.1% | 7,537 |
| 2008 | 7,285.6 | 32.8% | 7,803 |
| 2009 | 4,386.2 | 19.8% | 7,862 |
| 2010 | 3,546.3 | 16.0% | 7,420 |
| 2011 | 1,999.2 | 9.0% | 7,675 |
| 2012 | 5,021.6 | 22.6% | 7,495 |
| 2013 | 5,044.6 | 22.8% | 7,433 |
| 2014 | 4,152.6 | 18.7% | 7,252 |
| 2015 | 3,909.7 | 17.6% | 7,669 |
| 2016 | 2,584.9 | 12.3% | 7,612 |
| 2017 | 2,344.6 | 26.2% | 7,175 |
| 2018 | 4,178.8 | 46.8% | 7,044 |
| 2019 | 5,220.8 | 58.4% | 7,064 |
| 2020 | 5,223 | 58.3% | 7,060 |
| 2021 | 5,322.6 | 59.9% | 6,950 |
| 2022 | 5,118.4 | 57.9% | 7,046 |
| 2023 | 5,336.8 | 60.9% | 6,995 |
| 2024 | 3,931.2 | 44.9% | 7,137 |
| 2025 | 2,068 | 23.4% | 7,223 |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| BAT2 | Batteries | BA | 100 | 100 | May 2021 | Operating | — | coming soon |
| BAT3 | Batteries | BA | 350 | 350 | Jun 2023 | Operating | — | coming soon |
| CT1A | Natural Gas Fired Combined Cycle | CT | 233 | 165 | Jul 2002 | Operating | — | coming soon |
| CT1B | Natural Gas Fired Combined Cycle | CT | 233 | 165 | Jul 2002 | Operating | — | coming soon |
| CT2A | Natural Gas Fired Combined Cycle | CT | 233 | 165 | Jul 2002 | Operating | — | coming soon |
| CT2B | Natural Gas Fired Combined Cycle | CT | 233 | 165 | Jul 2002 | Operating | — | coming soon |
| ST1 | Natural Gas Fired Combined Cycle | CA | 233 | 180 | Jul 2002 | Operating | — | coming soon |
| ST2 | Natural Gas Fired Combined Cycle | CA | 233 | 180 | Jul 2002 | Operating | — | coming soon |
| GEN6 | — | ST | 702 | 739 | Dec 1967 | not_current | — | coming soon |
| GEN7 | — | ST | 702 | 739 | Aug 1968 | not_current | — | coming soon |
| NWG1 | — | — | 530 | 530 | planned Aug 2002 | not_current | — | coming soon |
| NWG2 | — | — | 530 | 530 | planned Aug 2002 | not_current | — | coming soon |
| 6 | Natural Gas Steam Turbine | ST | 702 | 754 | Dec 1967 | Retired Dec 2016 | — | coming soon |
| 7 | Natural Gas Steam Turbine | ST | 702 | 755 | Aug 1968 | Retired Dec 2016 | — | coming soon |
| BAT1 | Batteries | BA | 300 | 300 | May 2021 | Retired Jan 2025 | — | coming soon |
Owner / operator
Operator: Dynegy -Moss Landing LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Dynegy -Moss Landing LLC | 100.0% | 1,848 MW |
Nearby plants
Within 80 km.
| Elkhorn Battery Energy Storage System | 183 MW | 0.4 km |
| Monterey Regional Water Pollution Contro | 1 MW | 9.3 km |
| Marina Landfill Gas | 5 MW | 10.3 km |
| Monterey Regional Water Cogen Facility | 2 MW | 11.1 km |
| Ameresco Santa Cruz Energy | 3 MW | 12.9 km |
| Graniterock Quarry | 4 MW | 17.9 km |