← Back to map

Yale New Haven - New London

New London County, Connecticut · EIA plant ID 66455 · Operator: Bloom Energy
Natural gasOther Natural GasISONEBA: ISNE
Nameplate2MWSummer 2 MW
Generators1in service
Net generation14GWh12 mo to Dec 2025
Capacity factor89%gas/coal/oil units, summer MW
Heat rate7,181Btu/kWhfossil units, electric fuel, HHV
First online2022Runs as baseload

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.51GWh202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%25%50%75%2022202320242025202688.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
6,0006,5007,000202220232024202520267,181 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20224.177.5%6,221
202314.692.3%6,321
202414.692.3%6,824
20251488.9%7,181

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
YNH01Other Natural GasFC1.81.8Sep 2022Operating—coming soon

Owner / operator

Operator: Bloom Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Bloom Energy100.0%2 MW

Nearby plants

Within 80 km.
Pfizer Groton Plant38 MW2.3 km
Pfizer Groton Fuel Cell6 MW2.9 km
Bridge Street 1 & 25 MW3.5 km
Groton Flanders Road Landfill—4.9 km
Connecticut College1 MW5 km
Water Treatment 1 & 25 MW5.5 km