Connecticut College
New London County, Connecticut · EIA plant ID 66152 · Operator: Bloom Energy
Nameplate1MWSummer 1 MW
Generators1in service
Net generation10GWh12 mo to Dec 2025
Capacity factor96%gas/coal/oil units, summer MW
Heat rate6,894Btu/kWhfossil units, electric fuel, HHV
First online2019Runs as baseload
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2022 | 9.4 | 89.2% | 7,134 |
| 2023 | 8.1 | 77.0% | 6,904 |
| 2024 | 9.1 | 86.5% | 6,750 |
| 2025 | 10.1 | 96.4% | 6,894 |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| CNC00 | Other Natural Gas | FC | 1.2 | 1.2 | Sep 2019 | Operating | — | coming soon |
Owner / operator
Operator: Bloom Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Bloom Energy | 100.0% | 1 MW |
Nearby plants
Within 80 km.
| CMEEC - Polaris Park Solar Hybrid | 4 MW | 2.2 km |
| Subase Microgrid Project | 7 MW | 2.5 km |
| Naval Sub Base New London Fuel Cell | 7 MW | 2.5 km |
| CMEEC - Navy NE Trident | 1 MW | 2.5 km |
| Bridge Street 1 & 2 | 5 MW | 2.7 km |
| Yale New Haven - New London | 2 MW | 5 km |