Woodville RTO BTM
Sandusky County, Ohio · EIA plant ID 66444 · Operator: American Mun Power-Ohio, Inc
Nameplate3MWSummer 3 MW
Generators1in service
Net generation0GWh12 mo to Dec 2025
Capacity factor1%gas/coal/oil units, summer MW
Heat rate8,631Btu/kWhfossil units, electric fuel, HHV
First online2020Runs as rarely runs
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2022 | 0 | 0.1% | 14,034 |
| 2023 | 0.1 | 0.3% | 8,213 |
| 2024 | 0.1 | 0.6% | 9,326 |
| 2025 | 0.1 | 0.5% | 8,631 |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| PB1 | Petroleum Liquids | IC | 2.7 | 2.7 | Oct 2020 | Operating | — | coming soon |
Owner / operator
Operator: American Mun Power-Ohio, Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| American Mun Power-Ohio, Inc | 100.0% | 3 MW |
Nearby plants
Within 80 km.
| Martin Marietta Wind Project | 5 MW | 0.8 km |
| Genoa Diesel Generating Station | 6 MW | 5.7 km |
| Troy Energy LLC | 796 MW | 7.8 km |
| DG AMP Solar Bowling Green | 20 MW | 19.1 km |
| Fremont Energy Center | 740 MW | 19.5 km |
| IGS PCW1 | 3 MW | 20.1 km |