Martin Marietta Wind Project
Sandusky County, Ohio · EIA plant ID 66261 · Operator: OEE XXXIII LLC
Nameplate5MWSummer 5 MW
Generators3in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online2023
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2023 | 0 | 0.0% | — |
| 2024 | 7.2 | 18.2% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| WTG01 | Onshore Wind Turbine | WT | 1.5 | 1.5 | Dec 2023 | Operating | — | goldwind GW 87/1500 |
| WTG02 | Onshore Wind Turbine | WT | 1.5 | 1.5 | Dec 2023 | Operating | — | goldwind GW 87/1500 |
| WTG03 | Onshore Wind Turbine | WT | 1.5 | 1.5 | Dec 2023 | Operating | — | goldwind GW 87/1500 |
Owner / operator
Operator: OEE XXXIII LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| OEE XXXIII LLC | 100.0% | 5 MW |
Nearby plants
Within 80 km.
| Woodville RTO BTM | 3 MW | 0.8 km |
| Genoa Diesel Generating Station | 6 MW | 4.8 km |
| Troy Energy LLC | 796 MW | 7.8 km |
| DG AMP Solar Bowling Green | 20 MW | 19.5 km |
| Fremont Energy Center | 740 MW | 19.8 km |
| IGS PCW1 | 3 MW | 19.9 km |