MRG Goody Solar Project HybridUnder construction
Lamar County, Texas · EIA plant ID 66390 · Operator: Nexus Renewable Power, LLC
221 MW under construction (Batteries, Solar Photovoltaic), first expected Oct 2026 · EIA-860M
Nameplate—MWSummer — MW
Generators0in service · 221 MW building
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| GDYES | Batteries | BA | 50.4 | 50.4 | planned Oct 2026 | Under construction | — | coming soon |
| GDYPV | Solar Photovoltaic | PV | 170.8 | 170.8 | planned Oct 2026 | Under construction | — | coming soon |
Owner / operator
Operator: Nexus Renewable Power, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Nearby plants
Within 80 km.
| Tyson Nick | 91 MW | 0.7 km |
| Lamar Power Project | 1,113 MW | 3.7 km |
| Roscommon Solar Park | — | 6.2 km |
| Paris Energy Center | 266 MW | 9.2 km |
| Eiffel Solar Project | 240 MW | 10.6 km |
| Rowdy Creek Solar and BESS | — | 13.2 km |