← Back to map

Yellow Pine Solar

Clark County, Nevada · EIA plant ID 66357 · Operator: Yellow Pine Solar, LLC
SolarBatteriesSolar PhotovoltaicBA: NEVP
Nameplate190MWSummer 143 MW
Generators2in service
Net generation367GWh12 mo to Aug 2026
Capacity factor46%solar units, summer MW
Heat rate—thermal plants only
First online2023

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
010203040GWh202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%2023202420252026202746.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2023178.944.6%—
202438147.8%—
2025376.347.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
YPESBatteriesBA6548.8Jul 2023Operating—coming soon
YPS1Solar PhotovoltaicPV12593.8Jul 2023Operating—coming soon

Owner / operator

Operator: Yellow Pine Solar, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Yellow Pine Solar, LLC100.0%190 MW

Nearby plants

Within 80 km.
Yellow Pine II210 MW1.8 km
Purple Sage Energy Center—5 km
Rough Hat—6.4 km
MDU / NVSS-II14 MW29.2 km
Goodsprings Waste Heat Recovery8 MW43.5 km
IKEA Las Vegas 4621 MW44.4 km