Callisto I Energy Center

Harris County, Texas · EIA plant ID 66338 · Operator: Callisto I Energy Center
BatteryBatteriesERCOTBA: ERCO
Nameplate223MWSummer 200 MW
Generators1in service
Net generation-20GWh12 mo to Aug 2026
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online2024

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-2.5-2-1.5-1-0.50GWh20252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2024-3.7——
2025-23.5——

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
CALL1BatteriesBA223.4200Aug 2024Operating—coming soon

Owner / operator

Operator: Callisto I Energy Center. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Callisto I Energy Center100.0%223 MW

Nearby plants

Within 80 km.
Friendswood Energy265 MW0.1 km
Callisto II Energy Center—0.2 km
Pamela Heights I Energy Center—0.2 km
HO Clarke Generating484 MW0.2 km
OTHERTraditionBuffalo1 MW4.8 km
TECO CHP-198 MW8.1 km