← Back to map

Friendswood Energy

Harris County, Texas · EIA plant ID 60468 · Operator: Tejas Power Generation LLC
Natural gasNatural Gas Fired Combustion TurbineERCOTBA: ERCO
Nameplate265MWSummer 252 MW
Generators4in service
Net generation45GWh12 mo to Dec 2025
Capacity factor4%gas/coal/oil units, summer MW
Heat rate13,634Btu/kWhfossil units, electric fuel, HHV
First online2018Runs as peaking

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
01020GWh2019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%2018201920202021202220232024202520264.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
12,50013,00013,50020182019202020212022202320242025202613,634 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201823.313.6%13,381
201970.66.9%12,698
202023.82.3%12,782
202152.15.1%13,215
2022737.1%12,953
202388.28.6%13,013
202465.76.4%13,531
202545.24.4%13,634

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GT-1Natural Gas Fired Combustion TurbineGT121.5126Nov 2018Operating—coming soon
GT-2Natural Gas Fired Combustion TurbineGT47.942May 2026Operating—coming soon
GT-3Natural Gas Fired Combustion TurbineGT47.942May 2026Operating—coming soon
GT-4Natural Gas Fired Combustion TurbineGT47.942May 2026Operating—coming soon

Owner / operator

Operator: Tejas Power Generation LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Tejas Power Generation LLC100.0%265 MW

Nearby plants

Within 80 km.
Callisto I Energy Center223 MW0.1 km
HO Clarke Generating484 MW0.2 km
Callisto II Energy Center—0.2 km
Pamela Heights I Energy Center—0.2 km
OTHERTraditionBuffalo1 MW4.8 km
TECO CHP-198 MW8.1 km