← Back to map

Blake Solar Plant

Jefferson County, West Virginia · EIA plant ID 66276 · Operator: Horus West Virginia 1, LLC
SolarSolar PhotovoltaicPJMBA: PJM
Nameplate96MWSummer 80 MW
Generators1in service
Net generation154GWh12 mo to Aug 2026
Capacity factor22%solar units, summer MW
Heat rate—thermal plants only
First online2024

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
05101520GWh20252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%202420252026202722.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2024143.924.5%—
2025158.122.6%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
US620Solar PhotovoltaicPV9680Mar 2024Operating—coming soon

Owner / operator

Operator: Horus West Virginia 1, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Horus West Virginia 1, LLC100.0%96 MW

Nearby plants

Within 80 km.
Millville Hydro Station3 MW4.3 km
Rippon Energy Facility—7.7 km
Redbud Run Solar—22.4 km
Dam No. 4 Hydro Station2 MW25.5 km
Frederick County LFGTE Facility2 MW26.5 km
Bedington Energy Facility, LLC—30.2 km