← Back to map

Misenheimer Solar LLC

Stanly County, North Carolina · EIA plant ID 66237 · Operator: Misenheimer Solar LLC
SolarSolar PhotovoltaicBA: DUK
Nameplate74MWSummer 74 MW
Generators1in service
Net generation161GWh12 mo to Aug 2026
Capacity factor25%solar units, summer MW
Heat rate—thermal plants only
First online2024

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
051015GWh202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%202420252026202724.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202411323.0%—
202516124.7%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN01Solar PhotovoltaicPV74.474.4Apr 2024Operating—coming soon

Owner / operator

Operator: Misenheimer Solar LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Misenheimer Solar LLC100.0%74 MW

Nearby plants

Within 80 km.
Misenheimer Farm5 MW1.2 km
Buddy Solar4 MW9.1 km
Tuckertown Hydro42 MW11.3 km
Meadowbrook Solar Farm5 MW11.6 km
Violet Solar5 MW13.7 km
Organ Church Solar5 MW14.7 km