Organ Church Solar

Rowan County, North Carolina · EIA plant ID 60284 · Operator: GSRP
SolarSolar PhotovoltaicBA: DUK
Nameplate5MWSummer 5 MW
Generators1in service
Net generation10GWh12 mo to Dec 2025
Capacity factor23%solar units, summer MW
Heat rate—thermal plants only
First online2019

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.250.50.751GWh202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2019202020212022202320242025202623.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20199.423.9%—
202010.624.1%—
20211022.8%—
202210.824.7%—
202310.323.5%—
202410.223.3%—
202510.123.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PV1Solar PhotovoltaicPV55Feb 2019Operating—coming soon

Owner / operator

Operator: GSRP. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Organ Church Solar100.0%5 MW

Nearby plants

Within 80 km.
Rockwell Solar LLC4 MW2.8 km
Meadowbrook Solar Farm5 MW6.8 km
Buddy Solar4 MW8.1 km
Catawba Solar LLC2 MW11.8 km
Salisbury Solar4 MW12.2 km
Violet Solar5 MW14.2 km