← Back to map

Lake Mabel Solar and Battery Storage

Polk County, Florida · EIA plant ID 66128 · Operator: Tampa Electric Co
SolarBatteriesSolar PhotovoltaicBA: TEC
Nameplate115MWSummer 115 MW
Generators2in service
Net generation134GWh12 mo to Aug 2026
Capacity factor21%solar units, summer MW
Heat rate—thermal plants only
First online2023

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
051015GWh202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2023202420252026202721.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202359.1%—
2024131.720.1%—
2025129.920.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Solar PhotovoltaicPV74.574.5Dec 2023Operating—coming soon
BESS1BatteriesBA4040Mar 2025Operating—coming soon

Owner / operator

Operator: Tampa Electric Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Tampa Electric Co100.0%115 MW

Nearby plants

Within 80 km.
Florida's Natural Growers11 MW7.6 km
Legoland Solar1 MW7.9 km
Cutrale Citrus Juices USA II8 MW20.3 km
Peace Creek Solar55 MW20.9 km
Osprey Energy Center Power Plant644 MW21.1 km
Bartow Solar Energy LLC7 MW21.3 km