Blue Elk II Solar, LLC

Ingham County, Michigan · EIA plant ID 66105 · Operator: Blue Elk II Solar, LLC
SolarSolar PhotovoltaicMISOBA: MISO
Nameplate20MWSummer 20 MW
Generators1in service
Net generation35GWh12 mo to Dec 2025
Capacity factor20%solar units, summer MW
Heat rate—thermal plants only
First online2024

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
024GWh20242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20242025202620.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202425.621.8%—
202535.120.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BEIISolar PhotovoltaicPV2020May 2024Operating—coming soon

Owner / operator

Operator: Blue Elk II Solar, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Blue Elk II Solar, LLC100.0%20 MW

Nearby plants

Within 80 km.
Grand Basin Energy Storage—9.5 km
Blue Elk III Solar, LLC20 MW9.6 km
Surbrook Solar, LLC10 MW13 km
Spartan PV 1, LLC11 MW23.4 km
T B Simon Power Plant128 MW23.7 km
Eckert Stationretired24.7 km