Blue Elk III Solar, LLC

Ingham County, Michigan · EIA plant ID 66103 · Operator: Blue Elk III Solar, LLC
SolarSolar PhotovoltaicMISOBA: MISO
Nameplate20MWSummer 20 MW
Generators1in service
Net generation37GWh12 mo to Dec 2025
Capacity factor21%solar units, summer MW
Heat rate—thermal plants only
First online2023

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
01234GWh202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%202320242025202621.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20230.42.9%—
202436.420.7%—
202536.921.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BEIIISolar PhotovoltaicPV2020Dec 2023Operating—coming soon

Owner / operator

Operator: Blue Elk III Solar, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Blue Elk III Solar, LLC100.0%20 MW

Nearby plants

Within 80 km.
Blue Elk II Solar, LLC20 MW9.6 km
Grand Basin Energy Storage—13.7 km
Surbrook Solar, LLC10 MW16.5 km
Delta Energy Park263 MW20.1 km
Erickson Stationretired20.3 km
Delta Solar Power I8 MW22.3 km