← Back to map

Generate Colchester Fuel Cells, LLC

New London County, Connecticut · EIA plant ID 66053 · Operator: Generate Colchester Fuel Cells, LLC
Natural gasOther Natural GasISONEBA: ISNE
Nameplate10MWSummer 10 MW
Generators1in service
Net generation72GWh12 mo to Dec 2025
Capacity factor83%gas/coal/oil units, summer MW
Heat rate7,487Btu/kWhfossil units, electric fuel, HHV
First online2021Runs as baseload

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02468GWh2022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%25%50%75%2022202320242025202682.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
6,5007,0007,5008,000202220232024202520267,487 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202283.895.7%6,786
202382.393.9%7,803
202476.787.3%8,183
202572.482.6%7,487

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GCFCOther Natural GasFC1010Oct 2021Operating—coming soon

Owner / operator

Operator: Generate Colchester Fuel Cells, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Generate Colchester Fuel Cells, LLC100.0%10 MW

Nearby plants

Within 80 km.
Lebanon Pines 1 & 25 MW8.7 km
DWW Solar ll37 MW13.3 km
CMEEC - Bozrah3 MW14.6 km
Jefferson Solar1 MW15.7 km
Adams Solar1 MW15.7 km
Hamilton Solar1 MW15.8 km