Lebanon Pines 1 & 2
New London County, Connecticut · EIA plant ID 57604 · Operator: Connecticut Mun Elec Engy Coop
Nameplate5MWSummer 5 MW
Generators2in service
Net generation0GWh12 mo to Dec 2025
Capacity factor1%gas/coal/oil units, summer MW
Heat rate9,834Btu/kWhfossil units, electric fuel, HHV
First online2010Runs as rarely runs
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2011 | 0.4 | 1.0% | 10,153 |
| 2012 | 0.4 | 1.0% | 9,766 |
| 2013 | 0.7 | 1.5% | 9,671 |
| 2014 | 0.9 | 2.0% | 9,772 |
| 2015 | 0.8 | 1.8% | 9,510 |
| 2016 | 0.7 | 1.6% | 9,738 |
| 2017 | 0.5 | 1.2% | 9,806 |
| 2018 | 0.5 | 1.1% | 9,712 |
| 2019 | 0.5 | 1.2% | 9,827 |
| 2020 | 0.7 | 1.7% | 9,761 |
| 2021 | 0.5 | 1.1% | 10,199 |
| 2022 | 0.5 | 1.1% | 10,552 |
| 2023 | 0.6 | 1.3% | 9,795 |
| 2024 | 0.5 | 1.1% | 10,463 |
| 2025 | 0.4 | 0.9% | 9,834 |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| LP1 | Petroleum Liquids | IC | 2.6 | 2.5 | Apr 2010 | Operating | — | coming soon |
| LP2 | Petroleum Liquids | IC | 2.6 | 2.5 | Apr 2010 | Operating | — | coming soon |
Owner / operator
Operator: Connecticut Mun Elec Engy Coop. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Connecticut Mun Elec Engy Coop | 100.0% | 5 MW |
Nearby plants
Within 80 km.
| CMEEC - Bozrah | 3 MW | 6.1 km |
| Generate Colchester Fuel Cells, LLC | 10 MW | 8.7 km |
| LNG 1 & 2 | 5 MW | 9.5 km |
| CMEEC - Rogers Rd Solar | 1 MW | 9.7 km |
| Conn Mun Electric Energy Coop | 1 MW | 9.7 km |
| CMEEC - Norwich Stott St Solar Hybrid | 4 MW | 10.7 km |