← Back to map

Limelight Solar III, LLC

Spartanburg County, South Carolina · EIA plant ID 66005 · Operator: Limelight Solar III, LLC
SolarSolar PhotovoltaicBA: DUK
Nameplate4MWSummer 4 MW
Generators1in service
Net generation2GWh12 mo to Dec 2025
Capacity factor6%solar units, summer MW
Heat rate—thermal plants only
First online2020

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600800MWh2022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%202220232024202520265.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20227.523.9%—
20235.617.7%—
20244.413.8%—
20251.85.6%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
LIME3Solar PhotovoltaicPV3.63.6Dec 2020Operating—coming soon

Owner / operator

Operator: Limelight Solar III, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Limelight Solar III, LLC100.0%4 MW

Nearby plants

Within 80 km.
Limelight Solar I, LLC2 MW1.1 km
ATOOD Solar III LLC2 MW7.2 km
AGA TAG Solar III LLC2 MW7.2 km
Bryant Road Solar2 MW7.8 km
Limelight Solar II LLC2 MW10.2 km
Clifton Dam 3 Power Station1 MW13.9 km