← Back to map

Bryant Road Solar

Spartanburg County, South Carolina · EIA plant ID 64155 · Operator: JSD Flatwood PV-1, LLC
SolarSolar PhotovoltaicBA: DUK
Nameplate2MWSummer 2 MW
Generators1in service
Net generation2GWh12 mo to Dec 2025
Capacity factor9%solar units, summer MW
Heat rate—thermal plants only
First online2023

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300MWh202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%15%20232024202520269.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20232.314.5%—
20242.413.5%—
20251.69.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
2001Solar PhotovoltaicPV22Feb 2023Operating—coming soon

Owner / operator

Operator: JSD Flatwood PV-1, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
JSD Flatwood PV-1, LLC100.0%2 MW

Nearby plants

Within 80 km.
Limelight Solar II LLC2 MW5.1 km
Limelight Solar III, LLC4 MW7.8 km
Clifton Dam 3 Power Station1 MW8.8 km
Limelight Solar I, LLC2 MW9 km
AGA TAG Solar III LLC2 MW10.5 km
ATOOD Solar III LLC2 MW10.5 km