← Back to map

Dania Beach 7

Broward County, Florida · EIA plant ID 65978 · Operator: Florida Power & Light Co
Natural gasNatural Gas Fired Combined Cycle⛽ Dual-fuelBA: FPL
Nameplate1,448MWSummer 1,246 MW
Generators3in service
Net generation7,124GWh12 mo to Aug 2026
Capacity factor65%gas/coal/oil units, summer MW
Heat rate6,526Btu/kWhfossil units, electric fuel, HHV
First online2022Runs as baseload

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600GWh2023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%60%20222023202420252026202765.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
6,4006,4506,5006,5502022202320242025202620276,526 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20223,88153.0%6,493
20236,072.955.6%6,433
20247,066.864.6%6,526
20256,087.755.8%6,565

Fuel capability

Gas-fired turbines (CT/GT/CA/CS) that can also burn liquid fuel. EIA-860 Schedule 3 for capability, EIA-923 for actual burn.
StatusLikely still dual fuel
Liquid fuel burned · 36 mo142,534 MMBtu
Last month with liquid burnJun 2026
Switch while operatingNo
Net summer MW on gas1,246
Net summer MW on oil1,063
Time gas → oilunknown (EIA UNK)
Time oil → gasunknown (EIA UNK)

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
7GT1Natural Gas Fired Combined CycleCT492.2434.1May 2022Operating—coming soon
7GT2Natural Gas Fired Combined CycleCT492.2434.1May 2022Operating—coming soon
ST7Natural Gas Fired Combined CycleCA463.3377.8May 2022Operating—coming soon

Owner / operator

Operator: Florida Power & Light Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Florida Power & Light Co100.0%1,448 MW

Nearby plants

Within 80 km.
Lauderdale1,216 MW0 km
Wheelabrator South Broward66 MW0 km
Port Everglades1,352 MW7.5 km
Pembroke Lakes Mall1 MW12.4 km
CSL Gas Recovery11 MW24.6 km
Wynwood Energy Storage10 MW30 km