Young Wind

Young County, Texas · EIA plant ID 65763 · Operator: Young Wind, LLC
WindOnshore Wind TurbineERCOTBA: ERCO
Nameplate500MWSummer 500 MW
Generators1in service
Net generation1,618GWh12 mo to Aug 2026
Capacity factor37%wind units, summer MW
Heat rate—thermal plants only
First online2022

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
050100150200GWh2023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%20222023202420252026202736.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20227720.7%—
20231,58036.1%—
20241,557.235.4%—
20251,569.135.8%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
WYOUNOnshore Wind TurbineWT500500Dec 2022Operating—ge 2.82-127

Owner / operator

Operator: Young Wind, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Young Wind, LLC100.0%500 MW

Nearby plants

Within 80 km.
Graham635 MW22.5 km
Olney20 MW30.6 km
Trinity Hills198 MW32.2 km
Azure Sky Wind Project, LLC Hybrid470 MW39.5 km
Senate Wind LLC150 MW46.4 km
Barton Chapel Wind Farm120 MW48 km