SR Bell Buckle

Bedford County, Tennessee · EIA plant ID 65630 · Operator: sr bell buckle, llc
SolarSolar PhotovoltaicBA: TVA
Nameplate35MWSummer 35 MW
Generators1in service
Net generation72GWh12 mo to Aug 2026
Capacity factor23%solar units, summer MW
Heat rate—thermal plants only
First online2023

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02468GWh202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2023202420252026202723.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20236.512.7%—
202469.522.6%—
20256922.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
SRBELSolar PhotovoltaicPV3535Nov 2023Operating—coming soon

Owner / operator

Operator: sr bell buckle, llc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
sr bell buckle, llc100.0%35 MW

Nearby plants

Within 80 km.
SR Christiana, LLC3 MW16.8 km
SR Tullahoma—28.7 km
MTSU Power Co-Gen Plant5 MW32.4 km
Tims Ford46 MW44.7 km
Elora Solar150 MW57.7 km
McMinnville24 MW66.4 km