← Back to map

West Valley Mission CCD Solar Project

Santa Clara County, California · EIA plant ID 65570 · Operator: west valley-mission community college district
SolarBatteriesSolar PhotovoltaicCAISOBA: CISO
Nameplate4MWSummer 3 MW
Generators2in service
Net generation—GWh12 mo
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online2022

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
WVMBABatteriesBA0.90.9Sep 2022Operating—coming soon
WVMSPSolar PhotovoltaicPV2.72.5Sep 2022Operating—coming soon

Owner / operator

Operator: west valley-mission community college district. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
west valley-mission community college district100.0%4 MW

Nearby plants

Within 80 km.
Xilinx San Jose1 MW6.5 km
AGT000 Stevens Creek Fuel Cell2 MW6.8 km
Apple Campus 2 Fuel Cell4 MW7.3 km
Apple Campus 2 PV14 MW7.3 km
SCU000 El Camino Real Fuel Cell2 MW11.1 km
Verizon Comms Garage Top Solar Project2 MW12 km