Verizon Comms Garage Top Solar Project
Santa Clara County, California · EIA plant ID 65507 · Operator: verizon communications
Nameplate2MWSummer 2 MW
Generators1in service
Net generation0GWh12 mo to Dec 2025
Capacity factor5%solar units, summer MW
Heat rate—thermal plants only
First online2025
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2025 | 0.3 | 5.2% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| VCGSP | Solar Photovoltaic | PV | 2.3 | 2.3 | Sep 2025 | Operating | — | coming soon |
Owner / operator
Operator: verizon communications. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| verizon communications | 100.0% | 2 MW |
Nearby plants
Within 80 km.
| SCU000 El Camino Real Fuel Cell | 2 MW | 1 km |
| SC 1 Data Center, Phase 2 | 100 MW | 1.3 km |
| Santa Clara Cogen | retired | 1.6 km |
| SCC - San Jose | 1 MW | 2.3 km |
| Donald Von Raesfeld Power Plant | 154 MW | 3 km |
| Kifer BESS 1 | — | 3 km |