Kifer BESS 1Under construction

Santa Clara County, California · EIA plant ID 68953 · Operator: Kifer Energy Storage, LLC
BatteryCAISOBA: CISO

50 MW under construction (Batteries), first expected Dec 2026 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service · 50 MW building
Net generation—GWh12 mo
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
KB1BatteriesBA5050planned Dec 2026Under construction—coming soon

Owner / operator

Operator: Kifer Energy Storage, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Donald Von Raesfeld Power Plant154 MW0.1 km
EQX011 Duane Fuel Cell5 MW0.3 km
Intel Santa Clara1 MW1.4 km
Mission College Blvd. Fuel Cell5 MW1.5 km
Santa Clara Cogenretired1.5 km
CoreSite Real Estate SV9, L.P.32 MW1.5 km