← Back to map

Sealed Air Madera Solar Project

Madera County, California · EIA plant ID 65469 · Operator: sealed air corporation
SolarBatteriesSolar PhotovoltaicCAISOBA: CISO
Nameplate4MWSummer 4 MW
Generators2in service
Net generation7GWh12 mo to Dec 2025
Capacity factor28%solar units, summer MW
Heat rate—thermal plants only
First online2022

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-0.2500.250.50.751GWh202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%2022202320242025202628.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202200.0%—
20235.621.5%—
20246.123.3%—
20257.328.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
SAMBABatteriesBA0.80.8May 2022Operating—coming soon
SAMSPSolar PhotovoltaicPV33May 2022Operating—coming soon

Owner / operator

Operator: sealed air corporation. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
sealed air corporation100.0%4 MW

Nearby plants

Within 80 km.
CA - Madera USD - Madera South HS1 MW0.7 km
Madera Community Hospital1 MW1 km
KDC Solar Madera LLC10 MW4.8 km
Pacific Ethanol Madera Solar Array4 MW8.2 km
Borden Solar Farm50 MW8.5 km
City of Madera WWTP1 MW9 km