← Back to map

Ledyard Windpower, LLC

Kossuth County, Iowa · EIA plant ID 65390 · Operator: Duke Energy Renewables Services
WindOnshore Wind TurbineMISOBA: MISO
Nameplate207MWSummer 200 MW
Generators1in service
Net generation672GWh12 mo to Aug 2026
Capacity factor38%wind units, summer MW
Heat rate—thermal plants only
First online2022

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
020406080GWh2023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%20222023202420252026202738.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202262.241.8%—
2023666.538.0%—
2024790.745.0%—
2025595.934.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
LDYRDOnshore Wind TurbineWT207200Dec 2022Operating—vestas V150-4.2

Owner / operator

Operator: Duke Energy Renewables Services. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Ledyard Windpower, LLC100.0%207 MW

Nearby plants

Within 80 km.
Lakota Wind Wind Farm11 MW6.1 km
Golden Plains200 MW7.3 km
Bancroft4 MW17.7 km
Big Blue36 MW21.4 km
Crystal Lake 3 LLC66 MW21.9 km
Blue Earth11 MW23.1 km