Golden Plains

Winnebago County, Iowa · EIA plant ID 62081 · Operator: Interstate Power and Light Co
WindOnshore Wind TurbineMISOBA: MISO
Nameplate200MWSummer 200 MW
Generators1in service
Net generation788GWh12 mo to Aug 2026
Capacity factor45%wind units, summer MW
Heat rate—thermal plants only
First online2020

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
020406080GWh202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%2020202120222023202420252026202745.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2020582.539.7%—
2021738.942.2%—
2022885.550.6%—
2023750.142.9%—
2024745.942.5%—
2025736.842.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Onshore Wind TurbineWT199.8199.8Mar 2020Operating—ge 2.5-127

Owner / operator

Operator: Interstate Power and Light Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Interstate Power and Light Co100.0%200 MW

Nearby plants

Within 80 km.
Ledyard Windpower, LLC207 MW7.3 km
Lakota Wind Wind Farm11 MW11.8 km
Crystal Lake 3 LLC66 MW16.4 km
Bancroft4 MW22.3 km
Winnebago Wind Power Project20 MW23.7 km
Blue Earth11 MW24 km