← Back to map

Sunnybrook Solar Project - Hybrid

Halifax County, Virginia · EIA plant ID 65307 · Operator: sunnybrook farm solar, llc
SolarSolar PhotovoltaicPJMBA: PJM

13 MW planned (Batteries), first expected Jun 2027 · EIA-860M

Nameplate51MWSummer 51 MW
Generators1in service
Net generation90GWh12 mo to Aug 2026
Capacity factor20%solar units, summer MW
Heat rate—thermal plants only
First online2022

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02.557.510GWh2023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20222023202420252026202720.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20220.30.9%—
202382.818.5%—
202486.419.3%—
202589.820.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
SUNSSolar PhotovoltaicPV5151Dec 2022Operating—coming soon
SUNBBatteriesBA12.512.5planned Jun 2027Planned—coming soon

Owner / operator

Operator: sunnybrook farm solar, llc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
sunnybrook farm solar, llc100.0%51 MW

Nearby plants

Within 80 km.
Piney Creek Solar80 MW6.4 km
Halifax2 MW7.7 km
Crystal Hill Solar65 MW9.9 km
Halifax County Biomass50 MW11.2 km
Foxhound83 MW12.2 km
Clover Creek Solar—13.2 km