Piney Creek Solar
Halifax County, Virginia · EIA plant ID 62768 · Operator: Dominion Energy Inc
Nameplate80MWSummer 80 MW
Generators1in service
Net generation149GWh12 mo to Aug 2026
Capacity factor21%solar units, summer MW
Heat rate—thermal plants only
First online2023
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2023 | 53.6 | 18.3% | — |
| 2024 | 79.2 | 11.3% | — |
| 2025 | 153.5 | 21.9% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| PCSOL | Solar Photovoltaic | PV | 80 | 80 | Aug 2023 | Operating | — | coming soon |
Owner / operator
Operator: Dominion Energy Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Dominion Energy Inc | 100.0% | 80 MW |
Nearby plants
Within 80 km.
| Sunnybrook Solar Project - Hybrid | 51 MW | 6.4 km |
| Foxhound | 83 MW | 6.9 km |
| Clover Creek Solar | — | 7.1 km |
| Clover | 848 MW | 8.2 km |
| Halifax | 2 MW | 14.1 km |
| Crystal Hill Solar | 65 MW | 15 km |