Enloe Medical - Chico
Butte County, California · EIA plant ID 65210 · Operator: Bloom Energy
Nameplate2MWSummer 2 MW
Generators1in service
Net generation15GWh12 mo to Dec 2025
Capacity factor98%gas/coal/oil units, summer MW
Heat rate6,956Btu/kWhfossil units, electric fuel, HHV
First online2021Runs as baseload
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2021 | 7.5 | 86.2% | 6,310 |
| 2022 | 14.3 | 96.0% | 6,666 |
| 2023 | 13.5 | 90.4% | 6,734 |
| 2024 | 13.3 | 89.1% | 6,922 |
| 2025 | 14.5 | 97.7% | 6,956 |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| ENL00 | Other Natural Gas | FC | 1.7 | 1.7 | Jun 2021 | Operating | — | coming soon |
Owner / operator
Operator: Bloom Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Bloom Energy | 100.0% | 2 MW |
Nearby plants
Within 80 km.
| Sierra Nevada Brewing Co Hybrid | 4 MW | 3.6 km |
| Ameresco Butte County | 2 MW | 12.8 km |
| Centerville PH | 6 MW | 17.2 km |
| Butte College Main Campus Solar | 4 MW | 20.5 km |
| Forks of Butte Hydro Project | 15 MW | 23.3 km |
| De Sabla | 18 MW | 23.3 km |