500 MW under construction (Solar Photovoltaic), first expected Oct 2026 · EIA-860M

Nameplate52MWSummer 52 MW
Generators1in service · 500 MW building
Net generation1,098GWh12 mo to Aug 2026
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online2023

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
050100GWh202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2023398.1——
2024949.8——
20251,034.2——

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
ROSEBBatteriesBA51.851.8Jul 2023Operating—coming soon
ROSESSolar PhotovoltaicPV500500planned Oct 2026Under construction—coming soon

Owner / operator

Operator: enel green power roseland solar, llc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Enel Kansas, LLC100.0%52 MW

Nearby plants

Within 80 km.
True North Solar, LLC239 MW3 km
Copperhead Solar, LLC250 MW3.6 km
Prairie Hill Wind Project300 MW12.4 km
Sandy Creek Energy Station1,008 MW12.6 km
Naduah Solar—15.8 km
Marlin Solar5 MW20 km