Barnstable County, Massachusetts · EIA plant ID 65014 · Operator: asd cotuit ma solar llc
SolarBatteriesSolar PhotovoltaicISONEBA: ISNE
Nameplate6MWSummer 6 MW
Generators2in service
Net generation4GWh12 mo to Dec 2025
Capacity factor15%solar units, summer MW
Heat rate—thermal plants only
First online2023

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400MWh202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%15%202320242025202615.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20230.12.4%—
20242.28.4%—
20254.215.4%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
COT1Solar PhotovoltaicPV3.13.1Nov 2023Operating—coming soon
COT1BBatteriesBA2.52.5Aug 2024Operating—coming soon

Owner / operator

Operator: asd cotuit ma solar llc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
asd cotuit ma solar llc100.0%6 MW

Nearby plants

Within 80 km.
DG Crystal Spring CSG4 MW1.8 km
TJA MA Wakeby Road5 MW3.2 km
Sandwich4 MW3.2 km
118 Echo1 MW4.3 km
Green Meadows4 MW5 km
Mashpee Landfill Solar2 MW6.5 km