Green Meadows

Barnstable County, Massachusetts · EIA plant ID 58097 · Operator: Altus Power America Management, LLC
SolarSolar PhotovoltaicISONEBA: ISNE
Nameplate4MWSummer 4 MW
Generators1in service
Net generation5GWh12 mo to Dec 2025
Capacity factor17%solar units, summer MW
Heat rate—thermal plants only
First online2014

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600MWh20152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%15%201420162018202020222024202616.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20143.517.1%—
20155.517.9%—
20165.819.0%—
20175.517.8%—
20185.116.7%—
20194.414.4%—
20205.317.1%—
20215.216.9%—
20223.611.7%—
20233.511.3%—
20245.116.5%—
20255.116.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Solar PhotovoltaicPV3.53.5May 2014Operating—coming soon

Owner / operator

Operator: Altus Power America Management, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Altus Power America Management, LLC100.0%4 MW

Nearby plants

Within 80 km.
118 Echo1 MW2.9 km
DG Crystal Spring CSG4 MW3.3 km
ASD Cotuit MA Solar LLC6 MW5 km
MA Military Reservation Wind Project5 MW5.2 km
Mashpee Landfill Solar2 MW6.3 km
TJA MA Wakeby Road5 MW6.6 km