← Back to map

Gala (CSG)

Stephenson County, Illinois · EIA plant ID 64973 · Operator: gala solar, llc
SolarSolar PhotovoltaicPJMBA: PJM
Nameplate2MWSummer 2 MW
Generators1in service
Net generation3GWh12 mo to Dec 2025
Capacity factor18%solar units, summer MW
Heat rate—thermal plants only
First online2021

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.511.5GWh2022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%50%100%20212022202320242025202617.8% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20211.6106.5%—
20222.715.3%—
20235.732.6%—
20244.525.8%—
20253.117.8%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GALASolar PhotovoltaicPV22Dec 2021Operating—coming soon

Owner / operator

Operator: gala solar, llc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
gala solar, llc100.0%2 MW

Nearby plants

Within 80 km.
IL-Forefront ComEd-Lena 12 MW1.6 km
IL-Forefront ComEd-Lena 22 MW1.6 km
Dodds (CSG)2 MW2.6 km
Adkins Energy LLC7 MW2.8 km
Cedarville Road2 MW3 km
Olmstead II CSG2 MW3.8 km