← Back to map

Cedarville Road

Stephenson County, Illinois · EIA plant ID 64331 · Operator: SRC P9 - Lena Solar, LLC
SolarSolar PhotovoltaicPJMBA: PJM
Nameplate2MWSummer 2 MW
Generators1in service
Net generation4GWh12 mo to Dec 2025
Capacity factor20%solar units, summer MW
Heat rate—thermal plants only
First online2020

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400MWh2021202220232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%202020212022202320242025202620.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202000.1%—
2021422.6%—
20223.821.7%—
20233.620.4%—
20253.520.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
LENASolar PhotovoltaicPV22Dec 2020Operating—coming soon

Owner / operator

Operator: SRC P9 - Lena Solar, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
SRC P9 - Lena Solar, LLC100.0%2 MW

Nearby plants

Within 80 km.
Olmstead II CSG2 MW1 km
Adkins Energy LLC7 MW1.1 km
Unity Solar Project (IL)2 MW2.3 km
Harmony Solar Project2 MW2.4 km
IL-Forefront ComEd-Lena 22 MW2.8 km
IL-Forefront ComEd-Lena 12 MW2.8 km