Oak Trail Solar, LLC
Currituck County, North Carolina · EIA plant ID 64683 · Operator: Leeward Asset Management, LLC
Nameplate100MWSummer 100 MW
Generators1in service
Net generation230GWh12 mo to Aug 2026
Capacity factor26%solar units, summer MW
Heat rate—thermal plants only
First online2023
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2023 | 107 | 24.2% | — |
| 2024 | 237.4 | 27.0% | — |
| 2025 | 234.7 | 26.8% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| GEN01 | Solar Photovoltaic | PV | 100 | 100 | Jul 2023 | Operating | — | coming soon |
Owner / operator
Operator: Leeward Asset Management, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Leeward Asset Management, LLC | 100.0% | 100 MW |
Nearby plants
Within 80 km.
| Ranchland Solar, LLC | 60 MW | 4.7 km |
| Summit Farms Solar | 62 MW | 5.6 km |
| Shawboro PV1 | 20 MW | 12 km |
| Caden Energix Hickory LLC | 32 MW | 13.3 km |
| Morgan's Corner | 20 MW | 18.2 km |
| Grassfield Solar | 20 MW | 21.7 km |