San Bernardino County, California · EIA plant ID 64624 · Operator: GSRP
Nameplate150MWSummer 150 MW
Generators2in service
Net generation286GWh12 mo to Aug 2026
Capacity factor34%solar units, summer MW
Heat rate—thermal plants only
First online2021
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2021 | 102 | 137.3% | — |
| 2022 | 280.8 | 32.9% | — |
| 2023 | 277.1 | 32.6% | — |
| 2024 | 283.7 | 33.1% | — |
| 2025 | 289 | 34.0% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| BESS1 | Batteries | BA | 50 | 50 | Dec 2021 | Operating | — | coming soon |
| GEN1 | Solar Photovoltaic | PV | 100 | 100 | Dec 2021 | Operating | — | coming soon |
Owner / operator
Operator: GSRP. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| HDSI, LLC | 100.0% | 150 MW |
Nearby plants
Within 80 km.
| High Desert Power Plant | 960 MW | 4.6 km |
| Alamo Solar | 20 MW | 5.6 km |
| Expressway Solar C2 | 2 MW | 6.4 km |
| Expressway Solar B | 2 MW | 6.6 km |
| Expressway Solar A | 2 MW | 6.7 km |
| Baldy Mesa Storage | — | 7.9 km |