Cement City Solar, LLC

Lenawee County, Michigan · EIA plant ID 64567 · Operator: AES Distributed Energy
SolarSolar PhotovoltaicMISOBA: MISO
Nameplate20MWSummer 20 MW
Generators1in service
Net generation32GWh12 mo to Dec 2025
Capacity factor18%solar units, summer MW
Heat rate—thermal plants only
First online2023

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
01234GWh202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%202320242025202618.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202332.118.3%—
202436.820.9%—
20253218.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
CMCTYSolar PhotovoltaicPV2020Jan 2023Operating—coming soon

Owner / operator

Operator: AES Distributed Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
AES Distributed Energy100.0%20 MW

Nearby plants

Within 80 km.
Blue Elk IV Solar, LLC20 MW18 km
Letts Creek Solar, LLC15 MW21.1 km
Blue Elk I Solar, LLC20 MW21.7 km
Hendershot Solar, LLC2 MW23.3 km
Adrian Energy Associates LLC2 MW24.5 km
Beecher Solar Park—25.4 km