Adrian Energy Associates LLC
Lenawee County, Michigan · EIA plant ID 54903 · Operator: EPP Renewable Energy
Nameplate2MWSummer 2 MW
Generators3in service
Net generation2GWh12 mo to Dec 2025
Capacity factor10%other units, summer MW
Heat rate—Btu/kWhfossil units, electric fuel, HHV
First online1994
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), other units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2001 | 16.8 | 80.0% | — |
| 2002 | 17.5 | 79.5% | 12,975 |
| 2003 | 16.5 | 78.5% | — |
| 2004 | 18.7 | 88.6% | — |
| 2005 | 18.6 | 88.5% | — |
| 2006 | 18.5 | 88.1% | — |
| 2007 | 17.8 | 84.7% | — |
| 2008 | 15.6 | 74.1% | — |
| 2009 | 17 | 80.8% | — |
| 2010 | 18.8 | 89.3% | — |
| 2011 | 16.4 | 78.2% | — |
| 2012 | 17.2 | 81.7% | — |
| 2013 | 16.7 | 79.2% | — |
| 2014 | 14.4 | 68.7% | — |
| 2015 | 19.5 | 92.8% | — |
| 2016 | 17.9 | 84.9% | — |
| 2017 | 15.6 | 74.2% | — |
| 2018 | 14.2 | 67.5% | — |
| 2019 | 13.6 | 64.6% | — |
| 2020 | 12.2 | 57.9% | — |
| 2021 | 11.2 | 53.1% | — |
| 2022 | 9.7 | 46.2% | — |
| 2023 | 9.3 | 44.0% | — |
| 2024 | 8.3 | 39.2% | — |
| 2025 | 2.1 | 10.2% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| UNT1 | Landfill Gas | IC | 0.8 | 0.8 | Dec 1994 | Operating | — | coming soon |
| UNT2 | Landfill Gas | IC | 0.8 | 0.8 | Dec 1994 | Operating | — | coming soon |
| UNT3 | Landfill Gas | IC | 0.8 | 0.8 | Dec 1994 | Operating | — | coming soon |
Owner / operator
Operator: EPP Renewable Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| LES Project Holdings LLC | 50.0% | 1 MW |
| DTE Biomass | 50.0% | 1 MW |
Nearby plants
Within 80 km.
| Blue Elk I Solar, LLC | 20 MW | 3.1 km |
| Blue Elk IV Solar, LLC | 20 MW | 6.6 km |
| Beecher Solar Park | — | 7.2 km |
| Hendershot Solar, LLC | 2 MW | 13.4 km |
| Cement City Solar, LLC | 20 MW | 24.5 km |
| Voyager Energy Storage | — | 32 km |