Hall Solar Energy Storage

Duplin County, North Carolina · EIA plant ID 64508 · Operator: North Carolina El Member Corp
BatteryBatteriesSolar PhotovoltaicBA: CPLE
Nameplate5MWSummer 5 MW
Generators2in service
Net generation3GWh12 mo to Dec 2025
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online2022

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300MWh2022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20223.4——
20233.5——
20243.5——
20253.3——

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BAT1BatteriesBA2.52.5Jan 2022Operating—coming soon
SOL1Solar PhotovoltaicPV22Jan 2022Operating—coming soon

Owner / operator

Operator: North Carolina El Member Corp. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
North Carolina El Member Corp100.0%5 MW

Nearby plants

Within 80 km.
Rose Hill2 MW3.5 km
Town of Cary2 MW3.5 km
Buttercup Solar, LLC5 MW3.6 km
Hickory5 MW5.7 km
Aspen Solar, LLC5 MW6 km
Nickelson Solar, LLC5 MW6.8 km