El Dorado County

El Dorado County, California · EIA plant ID 64402 · Operator: SkyHigh 2 Solar
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate2MWSummer 2 MW
Generators1in service
Net generation3GWh12 mo to Dec 2025
Capacity factor23%solar units, summer MW
Heat rate—thermal plants only
First online2021

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300400MWh2022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20212022202320242025202622.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20212.320.7%—
20223.224.0%—
20233.828.7%—
20242.922.2%—
2025322.6%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
ELDCOSolar PhotovoltaicPV1.51.5Mar 2021Operating—coming soon

Owner / operator

Operator: SkyHigh 2 Solar. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
SkyHigh 2 Solar100.0%2 MW

Nearby plants

Within 80 km.
White Rock/Slab Creek269 MW8.3 km
Chili Bar8 MW8.3 km
Rock Creek LP3 MW10.4 km
Deer Creek 21 MW15.6 km
El Dorado20 MW21 km
El Dorado Solar, LLC2 MW21.2 km