Highland Solar NorthPlanned

Highlands County, Florida · EIA plant ID 64345 · Operator: Placid Solar II, LLC
SolarBA: FPC

75 MW planned (Solar Photovoltaic), first expected May 2027 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1112Solar PhotovoltaicPV74.974.9planned May 2027Planned—coming soon

Owner / operator

Operator: Placid Solar II, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Highland Solar South75 MW2.5 km
Lake Placid Solar Power Plant62 MW8.2 km
Avon Parkretired33.7 km
Mare Branch75 MW33.9 km
Joshua Creek—34.6 km
Hardwood Hammock—34.6 km