Highlands County, Florida · EIA plant ID 62541 · Operator: Duke Energy Florida, Inc
SolarBatteriesSolar PhotovoltaicBA: FPC
Nameplate62MWSummer 62 MW
Generators2in service
Net generation88GWh12 mo to Aug 2026
Capacity factor22%solar units, summer MW
Heat rate—thermal plants only
First online2019

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02.557.510GWh2020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20192020202120222023202420252026202722.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20194.212.5%—
202096.924.5%—
202157.214.5%—
202277.819.7%—
20236316.1%—
202470.717.9%—
202572.718.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
ES1BatteriesBA17.317.3Feb 2023Operating—coming soon
PV1Solar PhotovoltaicPV4545Dec 2019Operating—coming soon

Owner / operator

Operator: Duke Energy Florida, Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Duke Energy Florida, Inc100.0%62 MW

Nearby plants

Within 80 km.
Highland Solar North—8.2 km
Highland Solar South75 MW8.4 km
Avon Parkretired30.4 km
Mare Branch75 MW40 km
Hardwood Hammock—41 km
Joshua Creek—41 km