Prospero Solar II

Andrews County, Texas · EIA plant ID 64325 · Operator: Prospero Solar II, LLC (Longroad)
SolarSolar PhotovoltaicERCOTBA: ERCO
Nameplate250MWSummer 250 MW
Generators1in service
Net generation670GWh12 mo to Aug 2026
Capacity factor31%solar units, summer MW
Heat rate—thermal plants only
First online2021

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0204060GWh20222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%202120222023202420252026202730.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202119921.7%—
2022554.725.3%—
2023672.130.7%—
2024680.631.0%—
202566730.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PROSPSolar PhotovoltaicPV250250Aug 2021Operating—coming soon

Owner / operator

Operator: Prospero Solar II, LLC (Longroad). Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Prospero Solar II, LLC (Longroad)100.0%250 MW

Nearby plants

Within 80 km.
Prospero Solar300 MW1.4 km
Frankel9 MW13.1 km
Alira—14 km
Jumbo Hill Wind Project161 MW15.7 km
Lapetus100 MW26.1 km
Tumbleweed9 MW28.3 km