← Back to map

Prospero Solar

Andrews County, Texas · EIA plant ID 62755 · Operator: Prospero Energy Project, LLC (Longroad)
SolarSolar PhotovoltaicERCOTBA: ERCO
Nameplate300MWSummer 300 MW
Generators1in service
Net generation690GWh12 mo to Aug 2026
Capacity factor26%solar units, summer MW
Heat rate—thermal plants only
First online2020

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
020406080GWh202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2020202120222023202420252026202726.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2020385.125.0%—
2021656.625.0%—
2022630.924.0%—
2023712.227.1%—
2024752.728.6%—
2025759.428.9%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PROSPSolar PhotovoltaicPV300300Jun 2020Operating—coming soon

Owner / operator

Operator: Prospero Energy Project, LLC (Longroad). Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Prospero Energy Project, LLC (Longroad)100.0%300 MW

Nearby plants

Within 80 km.
Prospero Solar II250 MW1.4 km
Frankel9 MW11.7 km
Alira—13.7 km
Jumbo Hill Wind Project161 MW14.9 km
Lapetus100 MW24.8 km
Tumbleweed9 MW27.5 km