← Back to map

Bear Branch SolarUnder construction

Stokes County, North Carolina · EIA plant ID 64168 · Operator: Bear Branch Solar
SolarBA: DUK

35 MW under construction (Solar Photovoltaic), first expected Jan 2027 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service · 35 MW building
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GENSolar PhotovoltaicPV34.534.5planned Jan 2027Under construction—coming soon

Owner / operator

Operator: Bear Branch Solar. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Carol Jean Solar4 MW3 km
Lick Creek Solar, LLC50 MW6.4 km
Belews Creek2,491 MW9.1 km
Germantown Solar, LLC2 MW15.3 km
Salem Energy Systems LLC5 MW17.3 km
Waste Management Piedmont LFGTE Project2 MW18.2 km