Route 66 Energy Center, LLC
Cibola County, New Mexico · EIA plant ID 64076 · Operator: Route 66 Energy Center, LLC
Nameplate50MWSummer 50 MW
Generators1in service
Net generation132GWh12 mo to Aug 2026
Capacity factor30%solar units, summer MW
Heat rate—thermal plants only
First online2022
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2022 | 101.9 | 35.0% | — |
| 2023 | 146 | 33.7% | — |
| 2024 | 140.8 | 32.4% | — |
| 2025 | 132 | 30.4% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| RTE66 | Solar Photovoltaic | PV | 49.5 | 49.5 | May 2022 | Operating | — | coming soon |
Owner / operator
Operator: Route 66 Energy Center, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Route 66 Energy Center, LLC | 100.0% | 50 MW |
Nearby plants
Within 80 km.
| Route 66 Energy Storage | 50 MW | 9.6 km |
| Grants CDEC 2 | 5 MW | 19.3 km |
| Red Mesa Wind LLC | 102 MW | 28.3 km |
| Bluewater CDEC 1 | 2 MW | 34.6 km |
| Cibola | 8 MW | 35.5 km |