← Back to map

Grants CDEC 2

Cibola County, New Mexico · EIA plant ID 62995 · Operator: Lightsource Renewable Energy Asset Management, LLC
SolarSolar PhotovoltaicBA: PNM
Nameplate5MWSummer 5 MW
Generators1in service
Net generation11GWh12 mo to Dec 2025
Capacity factor29%solar units, summer MW
Heat rate—thermal plants only
First online2019

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.51GWh202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%2019202020212022202320242025202629.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20190.12.8%—
202012.531.5%—
202112.231.0%—
202212.130.6%—
202312.230.8%—
202412.130.6%—
202511.529.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
NMGR1Solar PhotovoltaicPV4.54.5Dec 2019Operating—coming soon

Owner / operator

Operator: Lightsource Renewable Energy Asset Management, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Continental Divide Solar II, LLC100.0%5 MW

Nearby plants

Within 80 km.
Route 66 Energy Storage50 MW13.6 km
Bluewater CDEC 12 MW16.4 km
Route 66 Energy Center, LLC50 MW19.3 km
Escalante (NM)200 MW38 km
Escalanteretired38.8 km
Red Mesa Wind LLC102 MW42.3 km